yourKONECRANES.COM
Access your crane usage data, maintenance data and asset details on yourKONECRANES.com. Our cloud-based customer portal gives you a transparent view of service events and activities over any selected time period.
Access your crane usage data, maintenance data and asset details on yourKONECRANES.com. Our cloud-based customer portal gives you a transparent view of service events and activities over any selected time period.
The coke pit is the production heart of a petrochemical plant, a harsh environment full of moisture, corrosive fumes and abrasive dust. Work is fast and continuous, and downtime is crippling to production. Konecranes can provide lifting equipment and service that can meet these challenges safely and efficiently.
The coke pit is the production heart of a petrochemical plant, a harsh environment full of moisture, corrosive fumes and abrasive dust. That’s why all of Konecranes coker cranes are built to withstand your toughest conditions. EOT coker cranes employ an extremely high drum-to-sheave ratio—30:1 vs. the standard 24:1 which helps extend the lifetime of the ropes by up to 40%. It also has built-in overwrap preventer, intelligent load cells to help prevent overloaded or unbalanced loads, gearings (with 58 HRC), carburized, finish-ground and built to AGMA Class 11 minimum for strength needed to withstand daily, near-constant use.
The single leg gantry (SLG) crane comes with and without cantilever. SLG configuration fits layouts that benefit from the hopper-side runway rail being installed at the grade level. This arrangement saves the cost of an elevated runway structure on that side. SLGs can be used with traveling hoppers, an arrangement that increases the crane throughput by eliminating long travel in the crane work cycle.
The coke pit is the production heart of a petrochemical plant, a harsh environment full of moisture, corrosive fumes and abrasive dust. That’s why all of Konecranes coker cranes are built to withstand your toughest conditions.
EOT coker cranes employ an extremely high drum-to-sheave ratio—30:1 vs. the standard 24:1 which helps extend the lifetime of the ropes by up to 40%. It also has built-in overwrap preventer, intelligent load cells to help prevent overloaded or unbalanced loads, gearings (with 58 HRC), carburized, finish-ground and built to AGMA Class 11 minimum for strength needed to withstand daily, near-constant use.