EOT Coker Cranes

Overhead coker crane solutions

These are commonly found with spans up to  46 meter, and they feature independent traveling cabs for improved operator visibility. This design is often found in wide span layouts that have a separate drying pad alongside the pit. Coke that is discharged into the pit is moved to the drying pad for about 24 hours until it is sufficiently dewatered to be handled by a conveyor.