Enabling the SMR revolution with reliable lifting solutions

Small Modular Reactors (SMRs) are redefining the future of nuclear energy. By replacing traditional one-off megaprojects with factory-built modules and repeatable units, SMRs promise a new era of predictable costs and schedules.  

As the world transitions to cleaner energy sources, the role of reliable and efficient lifting solutions in SMR projects has never been more critical. At Konecranes, we are proud to be a global partner in this revolution, offering tailored lifting solutions that ensure safety, efficiency, and long-term reliability.

Heavy-lift operation using a Konecranes lifting tool to install a large power plant component
Heavy-lift operation using a Konecranes lifting tool to install a large power plant component

Why lifting shapes the schedule more than people expect

Cranes aren't an add-on to an SMR project. They're part of the building. 

Hook heights, wheel loads, rail embedments and maintenance access all shape how a reactor or fuel handling building gets designed. Decide them early, and lifting is engineered in alongside everything else. Decide them late, and the building has to change around them, often at real cost to the schedule. 

Cranes also carry a hard deadline of their own: they need to be installed, tested and qualified before nuclear fuel arrives on site, and then keep performing reliably for decades afterward. On a first-of-a-kind SMR project, that is one more constraint competing for attention in an already compressed build. 

With over 60 years in nuclear lifting, Konecranes treats crane design as part of the early planning conversation, not a line item to revisit once the building is drawn. 

Portrait of Steve Waisanen, Vice President and Head of Business Unit Nuclear, Konecranes.
Portrait of Steve Waisanen, Vice President and Head of Business Unit Nuclear, Konecranes.

“An SMR developer doesn’t want five different crane suppliers submitting five different documentation packages for one plant. We cover the nuclear-rated lifts and the standard ones, so our customers manage one relationship instead of a handful.” 

 Steve Waisanen, Vice President Head of BU Nuclear 

Teollisuuden_voima_olkiluoto
Teollisuuden_voima_olkiluoto

One qualified supplier, the right crane for the job

Not every lift inside an SMR plant needs the same equipment. 

Some, like fuel handling, call for single-failure-proof cranes built to the highest nuclear standards. Others, on the non-nuclear side of the plant, can be handled by standard overhead cranes at a fraction of the cost and complexity. 

Knowing which is which, and being able to supply both from one qualified source, simplifies documentation, procurement and project management for SMR developers managing an already complex build.

Men working at nuclear power plant
Men working at nuclear power plant

Built for decades, not just construction

An SMR plant operates for 60 to 80 years, far longer than it takes to build. Konecranes supports that full lifetime with predictive maintenance, remote monitoring and modernization services designed to keep lifting equipment reliable long after commissioning. Explore our nuclear service offering.

Teollisuuden_voima_olkiluoto
Teollisuuden_voima_olkiluoto

A promise that holds up

SMR developers are asking their entire supply chain to deliver on cost and schedule certainty. Getting lifting right, early, and from a single proven partner, is one part of making sure that promise holds.